Water diversion and power generation system for Shuiboxia Hydropower Station on the Bailongjiang River

DATE:2008-02-19 AUTHOR: SOURCE:本站原创

This project contains water diversion facilities, including a tunnel and multiple bridges. The total length of the construction is approximately 4.2 km long, and we are involved in section C1 of this project.