Wulongquan- Shaoguan section of the Wuhan- Guangzhou Passenger Railway Line

DATE:2008-02-19 AUTHOR: SOURCE:本站原创

This project is the longest line among all passenger railways currently under construction in China. The length of the main line is approximately 968.4 km. The maximum speed designed for this railway is 350 km/h. We provided design and survey services for the Wuhan-Huadu section of the project.